Swimming Pool Drogenbrood Beernem

A New Pool Complex

Customer
Municipality of Beernem
Building place
Beernem
Type of building
Sport and education
Sector
Public sector
Floor space of the building
3 696,15 m²
Project sheet
Beernem Swimming Pool -© ACH Bouw
Beernem Swimming Pool -© ACH Bouw
After the realisation of the new Drogenbrood sports hall in 2013 and the addition of an additional multipurpose hall in 2017, the ABETEC team was allowed to design a new swimming pool complex. 
A design that fits seamlessly with the already existing sports hall. As we used the same materials for the extension as those already in place, a unity was created.

Construction of the new complex started in March 2022. The new pool was to replace the previous one, which dates back to 1972.
This new complex includes a 25-metre pool with eight lanes, a baby and toddler pool and an instruction pool with a moveable bottom up to 3.40 metres deep. Thus suitable for both a deep dive and splashing for young and old.

The swimming pool will be built against the sports hall, on the free zone between the cafeteria and the cyclocross track.

Salt electrolysis was chosen to disinfect the pool water.  This is a technique in which chlorine is produced on site. Using salt electrolysis is better for air and water quality.

We wanted our design to motivate every target group and give everyone the opportunity to participate in sport by creating a pleasant environment.

After all, accessibility, multifunctional solutions and a legible building ensure greater user comfort and safety for everyone.

The new swimming pool opened its doors to the public on 13 April 2024.

ABETEC was in charge of architecture, structural engineering, techniques, pool techniques, water treatment, infrastructure, EPB-reporting and safety coordination.