Skip to main content

Ter Beke Nijmegen

New production and storage building for meat products

A building with the BREEAM-certificate 'Very Good' in the food sector
Customer
WDP
Building place
Bijsterhuizen (the Netherlands)
Type of building
Logistics, Industry
Sector
Private sector
Floor space of the building
14 000 m²
Project sheet
Ter Beke @ Wijchen
Ter Beke @ Wijchen
We completed this building in December 2010. Our services here were architecture, stability, techniques, infrastructure and safety coordination. A nice challenging total project!

The project was like starting with WDP as builder, when the end user came into the picture. Both WDP and Ter Beke wanted to put the emphasis on energy saving. Given that this is a refrigerated building, we speak of an annual high energy cost, of course. 
That's why we opted for a very energy-efficient cooling installation and put a lot of effort into insulating the building.
In order to limit the water bill and the impact on the environment, we used heat recovery from the cooling installation and the hot water is heated by the solar collectors.

ABETEC has also been able to add extra value to this dossier thanks to our knowledge of the hygiene regulations imposed by the authorities.